Why does log rotation fail when using ZIP compression in WinSyslog?#
This article explains why log rotation operations fail when the rotation action delay setting is configured too short, causing ZIP compression to be interrupted by the move operation before completion.
Problem#
Log rotation operations fail when the rotation action delay setting is configured too short, causing ZIP compression to be interrupted by the move operation before completion.
Symptoms#
Log files are compressed into ZIP format but remain in the live logging directory
Move operations fail after the configured delay period
Incomplete log rotation leaves compressed files in active directories
Current day logs may be archived prematurely when using time-based rotation triggers
Root Cause#
The “Maximum wait time for log rotation” setting in the WinSyslog Configuration Client controls the waiting period between when log rotation is triggered and when move operations begin. When this delay is too short (such as the default 15 seconds), ZIP compression processes that take longer than the delay period get interrupted by the move operation, causing the rotation to fail.
Solution#
Option 1: Increase Maximum Wait Time for Log Rotation#
Open the WinSyslog Configuration Client
Navigate to the rotation settings section
Locate the “Maximum wait time for log rotation” setting
Change the value from 15000 (15 seconds) to 60000 (60 seconds) or 120000 (120 seconds)
Save the configuration and restart the WinSyslog service
Test log rotation during the next scheduled rotation period
Option 2: Switch to Size-Based Rotation#
Change rotation trigger from time-based to size-based
Configure appropriate file size thresholds for rotation
Adjust rotation timing to avoid current-day log pre-archiving
Test rotation behavior with smaller log files first
Best Practices#
Set rotation action delay to at least 60 seconds when using ZIP compression
Consider increasing to 120 seconds for large log files or slow storage systems
Use size-based rotation instead of time-based to prevent current-day log pre-archiving
Verification#
Monitor log directories after rotation triggers to ensure files are properly moved
Check that compressed files are not remaining in live logging directories
Verify rotation completes within expected timeframes
Confirm no rotation failures in WinSyslog logs during test periods